首页 > 建筑规划> 注册建筑师
题目内容 (请给出正确答案)
[判断题]

In the construction of the WDM system, the fiber coiling quality is very important. Th

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“In the construction of the WDM…”相关的问题
第1题
施工缝(construction joint)的含义是?

点击查看答案
第2题
建设工程文件(construction project document)的含义是?

点击查看答案
第3题
施工现场(工地) (construction site)的含义是?

点击查看答案
第4题
Which of he following was not a reason for using bricks in construction?A.Wood had to be b

Which of he following was not a reason for using bricks in construction?

A.Wood had to be brought from some distance.

B.There was a considerable clay available.

C.The lumbering process depended on good roads.

D.The timber was not of good quality.

点击查看答案
第5题
The construction “honest people” is _______.

A.a coordinate construction

B.an exocentric construction

C.an endocentric construction

D.an immediate constituent

点击查看答案
第6题
项目管理实施规划(execution planning for construction project management)的含义是?

点击查看答案
第7题
It is stated in paragraph 1 that construction of a new education system __________.[A]

It is stated in paragraph 1 that construction of a new education system __________.

[A]challenges economists and politicians

[B]takes efforts of generations

[C] demands priority from the government

[D] requires sufficient labor force

点击查看答案
第8题
采用EPC合同模式报价时,最关键的因素是哪个?()

A.M(Management)

B.P(Procurement)

C.D(Design)

D.C(Construction)

点击查看答案
第9题
项目回访保修(return visit and guarantee for repair of construction project)的含义是?

点击查看答案
第10题
在epc模式中,engineering就是指具体的设计工作,procurement就是一指建筑设备材料采购,construc
tion内容包括施工,安装试车,技术培训等。()

点击查看答案
第11题
GSM2000 can process()data to provide a reference for network construction and evaluati

A.Map;

B. Subscriber complaints

C. Test

D. Frequency

E. Base station cell

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改