You send material to a subcontractor by posting a goods issue from the Stock Monitor
A.In a special stock, at the plant level from which the goods issue was posted
B.In a special stock, at the storage location level from which the goods issue was posted
C.In a separate storage location
D.In the consumption values of the material master as consumed quantity